Manual Calculation

a) Calculation

 

b) Inlet Checking

c= 0.0398, Y= 0.67

 

c) Outlet Control Headwater Depth at Inlet

 

d) Determine H

                                                (Eq 7.5)

                                                                (Eq 7.6)

 

e) Check Headwater Control

 

f) Outlet Velocity

Velocity at Outlet Vo= (0.9/0.283)=3.183 m/s

Velocity at downstream V= (0.9/1.767)=0.509 m/s

Vo/V= 6.250
Back: MSMAware Computation                 Next: Comparison

Print This Page Print This Page

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website