Manual Calculation

a) Calculation

 

b) Inlet Checking

c=0.0347, Y=0.81

 

c) Outlet Control Headwater Depth at Inlet

Critical depth,

 

d) Determine H

                                          (Eq 7.5)

                                                         (Eq 7.6)

 

e) Check Headwater Control

 

f) Outlet Velocity

Velocity at Outlet Vo= (0.9/0.45)=2.00 m/s

Velocity at Downstream V =(0.9/1.125)=0.8 m/s

Vo/V= 2.5

 

Back: MSMAware Computation                                Next: Comparison

Print This Page Print This Page

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website