MSMAware Computation

 

Step 1 : Perform Storm tutorial procedure using given sample data

Step 2 : Run “Storm”

Step 3 : Select ARI data to be used for “Temporal Pattern” and “Time Area Method” for “Pre” and “Post”.

Step 4: Perform “Temporal Pattern” tutorial procedure using given sample data for “Pre” and “Post”

Step 5 : Run “Temporal Pattern” and result will be appear as below:

Step 6 : Select “Time Area Method” and fill data in ” Catchment Weighted Losses” for “Pre” and “Post”

Step 7 : Fill data for “Interpolation of TA Diagram” for Pre and Post.

Step 8 : Fill data for “TAM Input”

Step 9 : Click button “Generate” and preliminary table of Time Area Method will be appear

Step 10 : Change “No of Isochrone ” into 6 for each minute.

Step 11 : Click button “Run” and result of Time Area Method will be appear.

Step 12 : Select “Detention Basin”

Step 13 : Fill in data in “General”‘

Step 14 : Select “Pre Post Setup” and click button “Build”

Step 15 : Carry data from pervious chapter will be appears and select the suitable ARI and change Pre ARI

Step 16 : Select “Outlet Structures” and add one “Orifice” as outlet and also fill the selected data

Step 17 : Select “SOF” and fill design detention basin area for each stage

Step 18 : Select “Data” and click button “Run” and result will be appears

 

Back :   Computation in MSMA (2011)                       Next : Manual calculation


 

Print This Page Print This Page