Manual Calculation

 

The result of computation using MSMAware was checked using spreadsheet in this section

 

1. Determination design storm inflow for the catchment 

 

The aim is to reduce the post-development peak flows for the minor and major system ARI to less than or equal to the pre-development peaks. The minor and major system design storms are 5 year and 50 year ARI, respectively in accordance with Table 1.1. The design storm for the secondary outlet spillway is 100 year ARi. Table 9.1 show Pre and Post development of hydograph.

 

Table 9.1 Pre and Post Development Hydrograph

 

2. Preliminary estimation of the required storage volume 

A preliminary estimate of the required basin volume can be made using the following equation for the major design storm ARI.

                             Equation 9.1

 

where:

Vs : Estimated storage volume
Vi : Inflow hydrograph runoff volume (m3)
Qj : Inflow hydrograph peak flow rate (m3/s)
Qo : Allowable peak outflow rate (m3/s)
 ti : Time base of the inflow hydrograph (min)
 tp : Time to peak of the inflow hydrograph (min)

 

The basin volume is estimated for each basin inflow hydrogaph as shown in Table 9.2 and maximum value selected.

 

Table 9.2 Preliminary Estimation Pond Volume

 

Figure 9.1 Graph of Pond Volume Estimation versus Storm Duration

 

3. Determine Stage Storage Discharge Relationship  

 

Table 9.3 Basin Stage Storage data

 

Figure 9.2 Graph of Storage versus Stage

Table 9.4 Basin Stage Discharge data

 

 

Figure 9.3 Graph of discharge versus stage

 

4. Storage Routing  

 

Table 9.5 Result of routing through the detention basin (50 year ARI, 10 min)

 

Figure 9.4 Basin inflow and outflow hydrographs for the critical 5 year ARI 10 min storm

 

Back : MSMAware Computation                                       Next : Comparison


Print This Page Print This Page

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website