MSMAware Computation

 

 

General Information

 

Location = Johor

Station = Empangan Sembrong

Project development = Bungalow low density

Terrain = Mild

 

Project size =3500 

Impervious area = 70% from total area

Pervious area = 30% from total area

 

Time concentration

 = 10 minutes

 = 5 minutes

 

OSD design = Below-ground storage

 

 

Step 1: Start MSMAware. Select ‘On-Site Detention’ tab.

 

For steps 2 until 15, please follow the steps shown in Case Study 1 for Kuala Lumpur. Please change the location according to your site location.
 

 

Editor :- Dilah – 14 March 14

 

 
Back : Case Study 2       Next : Manual Calculation
 

 