General data:
Location : Klinik Bukit Bendera, Pulau Pinang
Area : 30 Hectare
Time, Tc : 30 Minutes
²P24 : 150 mm
Site Condition : a) SemiD Houses
b) Park
c) Commercial
Step 1: Start MSMAware and click “Rational Method”. Make sure to compute the storm result before run the rational method. Follow steps shown in chapter 1 for design storm.
For steps 2 until 6, please follow the steps shown in case study 1 for Kuala Lumpur