Recommended Standard Durations

 
 
Table 3.1 (Table 13.4) gives the recommended time steps for durations of up to 360 minutes.

 

MSMA (2000) stated that for other durations, the temporal pattern for the nearest standard duration should be adopted. It is not correct to average the temporal patterns for different durations.

 

Table 3.1 Standard Durations for Urban Stormwater Drainage (MSMA, 2000)

.

 
 

Back : Theory                                          Next : East Malaysia Temporal Pattern

 

 

Print This Page Print This Page

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website