Manual Calculation

 

 

Table 3.15 shows the manual calculation result on temporal pattern for the case study location, calculated using spreadsheet based on the formulas explained in the theory section.
 

Table 3.15 Manual Calculation Using Spreadsheet for Pulau Pinang (MSMA 2011)

 
Figure 3.7 shows the bar chart of rainfall depth against time period for 30 minutes storm duration for Pulau Pinang based on MSMA (2011).

.

 

Figure 3.7 Temporal Pattern for Kilinik Bukit Bendera, Pulau Pinang (MSMA 2011)

 

 